PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor interior metal framing outside Courtroom waiting area Facing North-East.jpg 2nd floor sprinkler heads Facing North.jpg Erecting the stone panels at the East Elevation 1.jpg Erecting the stone panels at the East Elevation 2.jpg Erecting the stone panels at the East Elevation 3.jpg Erecting the stone panels at the East Elevation 4.jpg
Previous pageNext page 2nd floor sprinkler heads Facing North
2nd floor sprinkler heads Facing North